Training

Certify your team, together.

On-site or live virtual. Group training for the people who run the work.

Scroll
The path

Three belts. One path.

Each belt builds on the one before it. Start wherever your team is — most start with White.

01 — Foundations

White Belt

A white belt tied in a knot

A shared language for the whole floor, with no experience assumed and no statistics background required.

FormatOn-site or live virtual
PrerequisiteNone
  • 01

    The DMAIC cycle

    Define, Measure, Analyze, Improve, Control — the frame every project here runs inside, at a level anyone can follow.

  • 02

    The 8 wastes

    Motion, waiting, overproduction — named inside the work they already do every day.

  • 03

    Basic data literacy

    Reading variation without a statistics background, so a number on a board means something.

  • 04

    Visual management

    Making a problem visible at a glance, right where the work sits.

After the class: they spot issues in their own work and feed them up to the people running the project.

02 — Apply the methods

Green Belt

A green belt tied in a knot

Training, then a project they run themselves — on a real problem pulled out of your operation, not a case study.

FormatOn-site or live virtual
StructureClass, then a live project
PrerequisiteWhite Belt or equivalent
  • 01

    Value stream mapping

    The process as it runs today, waits included — not the version in the binder.

  • 02

    Root cause analysis

    5 Whys and fishbone. Why it happens, not only what shows up at the end of the line.

  • 03

    Measurement system analysis

    Whether the numbers can be trusted before anyone acts on them.

  • 04

    Process capability

    Whether the process can hit the spec that matters, on a repeat basis.

After the class: they run a project in their own area — data, a test, and proof the change held — usually alongside their regular job.

03 — Lead initiatives

Black Belt

A black belt tied in a knot

Training, then a project they lead. Run the work, coach the people running theirs, and own the numbers that go up.

FormatOn-site or live virtual
StructureClass, then a led project
PrerequisiteGreen Belt first — our requirement
  • 01

    Kaizen facilitation

    A team event that redesigns one process while the work is still live.

  • 02

    Design of experiments

    Several factors at once, to see what moves the result.

  • 03

    Statistical process control

    Keeping the process in control long after the change is in.

  • 04

    Leading teams through change

    Getting a floor to adopt a new way of working, which is where most projects fail.

After the class: they lead the project, mentor the Green Belts, and own the numbers that go up to leadership.

Next step

Not sure which belt your team needs?

Tell us how the work runs today. We’ll tell you where to start.

Contact us