White Belt
A shared language for the whole floor, with no experience assumed and no statistics background required.
- 01
The DMAIC cycle
Define, Measure, Analyze, Improve, Control — the frame every project here runs inside, at a level anyone can follow.
- 02
The 8 wastes
Motion, waiting, overproduction — named inside the work they already do every day.
- 03
Basic data literacy
Reading variation without a statistics background, so a number on a board means something.
- 04
Visual management
Making a problem visible at a glance, right where the work sits.
After the class: they spot issues in their own work and feed them up to the people running the project.
